Procedure

Major work - Installation and commissioning of Tower Crane

License application to install and operate a tower crane intended for lifting and distributing materials in construction sites.

OnlineOnline processing available
In-personIn-person care
With costCheck the price

What is this procedure?

License application to install and operate a tower crane intended for lifting and distributing materials in construction sites.


Who can apply for it?

The promoter of the work or legal representative.

What documentation must be submitted?

Generic:

All documents will include the brand, model and chassis number of the device to be installed.

Before assembling the tower crane:

Proof of the pre-application for aeronautical easements submitted by the developer to the State Air Safety Agency (AESA) through its website at the following address: air safety. Consult this link for more information on AESA authorizations. Health and Safety Study or Basic Health and Safety Study. Application Form. Photocopy of the new construction license. Proof of payment of the document issuance fee. In duplicate, tower crane project in accordance with arts. 26 and 125 of the Building Regulations and the complementary technical instruction ITC MIE-AEM-2 of the Regulation of Lifting and Handling Equipment, referring to tower cranes for works or other applications, approved by Royal Decree 836/2003, of June 27 (BOE 17-07-03). Certificate from the inspection and control entity (EIC) confirming that the elements of the dismantled crane have passed the inspection. Document endorsed by the official association and issued by a competent technician, which certifies that it assumes the assembly and control of the proper functioning and safety of the crane while it remains on the site. Insurance policy covering accidents that may occur due to the operation of the crane with a minimum coverage of 300,506.05 euros.

After assembling the tower crane:

GR1 form model duly completed and stamped by an inspection and control entity (EIC), as accreditation of the regulatory conditions of the tower crane after its assembly and before commissioning.





How much does it cost?

This procedure is not free.
Tax Ordinance No. 10:Fee for document dispatches.

Administrative information

The meaning of administrative silence Positive silence

Organizations involved in this procedure

Check which organization initiates the procedure, which is responsible for it and which resolves it.

Responsible

Organization responsible for managing the procedure.

Department of Urban Projects

Responsible
LocationCarrer Major, 2-4, 08820 El Prat de Llobregat.
Schedule

Monday to Friday from 9:30 to 14:00

Ajuntament del Prat de Llobregat - Principal933790050

Legislation